TFN Titan Fibre Networks

Titan Fibre Networks the owner of the Helios Network or cable is comprised of two sections. Totalling 144km of 360 fibre cores. The first section built in its own duct (conduit) solution. Commencing at the Sunshine Coast Cable Landing Station (NextDC SC1) at 44 Maud Street, Maroochydore and ending near iSeek LDR2. The second section continues in Telstra agreed duct, ending at NextDC B1 & B2. From Petrie to Brisbane the network increase in core count from 360 to 576 fibre cores.

The Helios network connects up with the RTI and Google subsea cables at Sunshine Coast and over 100 carriers located in Brisbane. This purpose built dedicated fibre network is designed to be diverse from the small carrier network in the region. Its unique design creates a digital express highway.

Public Network View

View the high level route of the TFN routes.

Open the Maps Page

Outages & Maintenance

Live view of incidents being handled by the control room team.

Need deeper detail? Access the full incident tracker inside the console.